The Do's & Don't Of Building Your Dream HomeThird in a series: Bricks And Mortar, Hammers And Nails, Getting Your House Built And On Track(If You Missed Part One Please Follow This
Link) By The Mortgage Guy / MortgageLoanRequest.com Well if you have been with us since the first of these articles you should now be familiar with: choosing a design and having an architect draw up the plan and schedules for materials and specifications. You've interviewed and chosen a contractor and you have set a date for the work to commence. Now the real job begins. Homes are not just bricks and mortar and plywood and paint, they are a living and breathing entity like no other. They are subject to their surroundings and the environment and therefore in a state of constant flux. Raising a roof from conception to certificate of occupancy is like raising a child. It takes your undivided attention, strength perseverance, and a bit of compassion. The easy and fun part was the conception. Raising them to become self-sufficient and freestanding is the arduous part. It would be impossible to cover all of the aspects of construction within the confines of this particular article, but we will begin to discuss and outline the tasks that you will need to supervise and accomplish, to get the job done, including the banking and inspections. If you have done your homework satisfactorily you have hired a contractor who you can rely on, and who you have been meeting for initial planning, scheduling and coordination. You have gone out to the site and you have had it surveyed and staked out. Tests were performed to determine how soft or hard the ground is, or if there is bedrock lying under the surface. (This is all very important information you will need to do this early on so that you can properly design the footings and foundation.) The utilities have been arranged for and you have temporary meters and hook ups for water and electric, and possibly a temporary, self-contained toilet facility as well. You have addressed all the concerns for permits and permissions and you have made preparations for site maintenance, trash removal (possibly a large steel refuse container, size depending on the scope of you project) and security during the course of your project. Both you, and the contractors, are insured and you have made provisions for the safe keeping of all tools, equipment, building supplies and materials that will be delivered to or kept on the job site. You are now ready to break ground and lay the foundation of your dreams.
Site Preparation And Foundation Work
Depending on the actual lay of the land, the environment and your design, you will be doing one of three things first: excavating a hole for a basement, trenching for piers and beams if it is to be a crawl space, or grading and trenching if your design calls for a slab. The key point here is to make sure the crew that performs this work is aware that the concrete is being mixed properly, and poured in the proper manner (be careful for rainy or very hot or cold days). Also make sure that any steel re-enforcing being used is of the proper gauge/weight and that the pour is allowed to cure for no less than two weeks before proceeding with that aspect of the job.
The tree most prevalent types of foundations in America are:
The next task at hand is the spill plate, joisting and floor decking. If you have chosen a crawl space or basement design the then piers or columns would have also been put into place to support the floor joists. If you are building on a slab, this is not necessary. One of the most important aspects of this next step is making certain that the framing crew, who has been the next team to arrive, use pressure treated lumber for the spill plate and any other wood that comes into contact with the concrete. (If you are using steel in any of your support structure, and wood touches it, it is still best to use pressure treated lumber for that task.)This will insure against rot and encourage longer life. Remember, this is the base for all else to be built. You do not want to have to be worrying about rot five years into the future. The entire house rests on these relatively few pieces of wood. There is nothing attaching it to the foundation and the sheer weight of the house will do this. The joists will then be attached to the spill late. Joists are usually constructed from 2 x 10 timbers and either blocking or steel brackets are used to reinforce the joints. There will be boxes-frames constructed from this stock and the main joists will be connected by the shorter ones, within the box-frame. The layout is such that 4 x 8 sheets of decking will rest upon the joists, with the seams running down the center of each joist for support. Decking can be cut from either ½ or 5/8 inch plywood or OSB (oriented strand board). Once again, the choice of product will have a lasting effect on the life and livability of your home. Each step and every piece is a part of the whole. If any one aspect is cheapened, or installed carelessly, the entire house will suffer for it one day. Most crews will have either electric or air powered nail and tacking equipment. If the joists are laid out properly, and the decking is secured to them with a good number of nails or staples, the floor will have a tremendous amount of strength. This same technique applies to the frame and studding, drywall and paneling, the outside sheathing and the roof. Most fasteners are relatively cheap, especially staples for air guns, be sure to use enough of them. Well, you've dug the biggest whole of your life, but you've also laid the foundation and built a support structure, not only for your house, but for your investment and your family's security and comfort as well. You have also acquired a bit of respect for the process. Now it's time to schedule a bank inspection, so that you can have the funding dispersed from your construction account, to pay the contractor and suppliers. Then you will be ready to continue with the next phase of your project.
Well, it's time for a much needed break, you earned it. Send one of the apprentices out for donuts and coffee, that's another thing the boss gets to do. And, tell him to ask the labor what they want. A cup of coffee will go along way to insuring your work crew is happy and performing well. When we get back to work we'll layout the petitions, frame-up the walls, and truss and sheath the roof. Next in the series: It Starting to Look Like A House
|
||||||||||||||||||||||||||
|
||||||||||||||||||||||||||